The electrician's quote, item by item
An electrician's quote counts points and items, not lump sums. And it ends with an inspection nobody enjoys charging for.
- Itemised quotes
- Safety report
- Swiss QR-bill
| Consumer unit, full replacement | 1 pc | 2'450.00 |
|---|---|---|
| Sockets and switches, 18 points | 18 pc | 1'620.00 |
| Earthing and equipotential bonding | 1 pc | 380.00 |
| OIBT safety report | 1 pc | 290.00 |
| Total excl. VAT | 4'740.00 CHF | |
The item, not the lump sum
Describe the installation, "eighteen points, board to replace, earthing", and every item takes its line with its quantity. A client who sees eighteen sockets priced does not argue with the total the way someone reading "electrical installation: lump sum" does.
The inspection that gets charged
The safety report required by the OIBT is a service, not a free formality. On its own line it stops being absorbed by the rest of the job, and the client understands they are paying for a legal obligation.
Changes made mid-job
A socket moved, a point added: it gets decided on site and always disappears between the job and the invoice. You add it from your phone, on the existing quote, before the ladder is packed away.
Property managers and main contractors
They want a referenced document with numbered items they can tick off one by one. That is exactly what Bilto produces, with nothing for you to reformat.
Can I number my items the way the property manager asks?
Yes, numbering is automatic and has no gaps. That is what lets a manager approve line by line without calling you back.
Can the safety report appear on the final invoice?
Yes, like any other item. Many electricians throw it in out of habit: on a visible line you quickly see what it adds up to over a year.
What if the client adds a point after accepting?
You add the item to the accepted quote, they re-approve from their phone, and the invoice picks up the lot. Nothing to retype.
Yours is not the only trade
Every page starts from a real sample quote and the constraints of that trade, not from a copied brochure.
- CarpenterThe carpentry quote, without losing your Sunday
- PlumberThe plumbing quote, written between two call-outs
- TilerThe tiling quote, wastage included
- HeatingThe heating quote, subsidy deducted
- LandscaperThe landscaper's quote, season after season
- PainterThe painting quote, by the square metre and with nothing forgotten